The Regional Municipality of Durham is proposing to reconstruct Wentworth Street (Regional Road 60), from Cedar Street to Farewell Street (Regional Road 56).
The reconstruction will include:
- Realignment of Wentworth Street between the intersections of Simcoe Street and Ritson Road
- Rebuilding the existing traffic signals at the Cedar Street, Simcoe Street, Ritson Road, and Wilson Road intersections with Wentworth Street
- A new traffic signal at Wentworth Street and Nelson Street
- Lane reconfiguration on Wentworth Street east of Nelson Street - the existing four through traffic lanes will be reconfigured to two through traffic lanes and a centre two-way left turn lane
- New asphalt pavement, new curb and gutter
- Replacement of watermain and sections of the storm sewer system
- A new three-metre wide asphalt multiuse path along the north side of Wentworth Street from Cedar Street to Farewell Street, and a new sidewalk on the south side of Wentworth Street from Nelson Street to Farewell Street
Questions: Should you have any questions or comments, please contact
the following staff member from the Regional Municipality of Durham Works Department.
Didi Shatil
Project Manager
905-668-7711 extension 3334
Didi.Shatil@durham.ca